ball TUNNEL WORK
ball Cut & Cover method
ball Tunnel Construction
ball Tunnel structure completed , Constructed & put into operation
ball South and North Tunnel Ramp
ball Hsintien River Tunnel
ball ARCHITECTURAL WORK
ball Taipei Main Station
ball Fu-Hsing; Kuang-Fu emergency halt
ball New Wanhua station
ball New Panchiao station
ball TRACK WORK
ball E & M WORK
ball Overhead Contact System (OCS)
1. The OCS system uses one messenger wire of 95 square millimeter and two contact wires of 107 square millimeter each supply power to the pantograph of locomotive.
2. Use grounding cage and the running rail as the current return circuit.
3. The catenary system shall be supported registered by means of hinged cantilevers attached to the anchor channel under the tunnel roof or the wall within the tunnel.
ball Signal System
1. Relay Interlocking System
2. C.T.C. (Centralized Traffic Control)
3. Electronic Interlocking System
ball Safety Facilities
There is more security facilities in the underground railway which makes the passengers or property; more safety and prevent any incident from the railway running.
1. Ventilation and Vapor
2. To extinct and extinguish
3. To prevent flood and pump station
4. To exit and evacuation
5. Central Supervision Remote Control (CSRC), Closed Circuit Television (CCTV)
Last Update : 2007-03-30   
icon
icon
icon
icon
Logo of RRB (flash file)
Back to homepage
Railway Reconstruction Bureau Railway Reconstruction Bureau Railway Reconstruction Bureau Railway Reconstruction Bureau Railway Reconstruction Bureau
Progress & Facilities
Back
Top