The railway construction is located in central of Metropolitan Taipei with the congested road traffic &
crowed of population by high difficulty and challenges.
|
| The main characteristics are : |
|
 |
The limited land width for construction, |
|
 |
To maintain the normal rail operation during the construction period, |
|
 |
To maintain the adjacent road traffic smoothed, |
|
 |
To maintain the corridor utilities functions, |
|
 |
Construction works are close to residency building, |
|
 |
Under the limited of bridges in the construction section, the construction machines equipment have
to revise and typical procedures,
|
|
|
 |
Environmental noise vibration, air and water pollution control; new construction methods require,
new conception and equipment to be brought in.
|
|
| New construction methods & new conceptions to be brought in : |
|
 |
Water Tight Concrete |
|
 |
Underpinning |
|
 |
Common Utility Culvert |